Bridge Rehabilitation over the West Branch of the Westfield River
Bridge Rehabilitation over the West Branch of the Westfield River
Chester, MA
This project for the MassHighway Department consists of the removal, rehabilitation and reconstruction of the historic Maple Street bridge. The existing bridge will be disassembled and removed from the site and the trusses will be repaired and painted. The bridge will be reassembled with the addition of a new concrete deck & bridge rail, bringing it up to modern standards.

Bridge Replacement, (Concrete)
Bridge Replacement, (Concrete)
Route 78 over Orcutt Brook, Warwick, MA
Replacement of a unique cast-in-place concrete arched bridge, while maintaining traffic flow.

Gooseneck Cove and Salt Marsh Restoration
Gooseneck Cove and Salt Marsh Restoration
Newport, RI
This project consists of site work and the installation of a new triple concrete box culvert with head walls and wing walls, the construction of an asphalt roadway over the top of the culvert, the removal of a small dam and installation of an addtional culvert to increase salinity for the restoration of the natural habitat.

Bridge Rehabilitation over the North River
Bridge Rehabilitation over the North River
Marshfield-Norwell, MA
This project for the MassHighway Department consists of the replacement of the existing superstructure with a new three span continous steel superstructure supported on rehabilitated piers and abutments. To accomodate vehicular traffic, the bridge demolition and reconstruction will occur in 2 phases, with temporary traffic signals alternating the flow of traffic through a single traffic lane.

Bridge Rehabilitation, (Timber)
Bridge Rehabilitation, (Timber)
Route 8A (North Heath Road) over Mill Brook (Bissell Bridge) Charlemont, MA
Rehabilitation of a historic wooden bridge for “a new life,” adding crash tested bridge rails and upgrading live loads to meet applicable load requirements.

Bridge Replacement, (Concrete) Page Rd over the Shawsheen River
Bridge Replacement, (Concrete) Page Rd over the Shawsheen River
Bedford, MA
This project for the MassHighway Department consists of replacing the bridge on Page Rd. over the Shawsheen River. The new bridge will consist of reinforced concrete abutments of drilled shafts and a single span composite deck. The bridge will be closed during construction, however water and telephone service over the bridge will continue without interruption.

Bridge Replacement
Bridge Replacement
Long Plain Rd. over the N.E. Central Railroad in the Town of Leverett
This project for the MassHighway Department consists of a complete bridge replacement being completed in two stages to minimize inconvenience to the public. The new bridge will be a three span structure with a total length of 183 feet supported by drilled shafts. The superstructure will consist of weathering steel with a concrete deck and an asphalt wearing surface.

(Indian) Bridge Replacement
(Indian) Bridge Replacement
Route 2, Charlemont, MA
This project for the Massachusetts Highway Department consists of a complete concrete deck replacement and structural steel repairs to a 300-foot bridge spanning the Deerfield River in Charlemont, MA. Care was taken to minimize traffic interference on this important roadway.

Replace HTHW Lines
Replace HTHW Lines
State University College at New Paltz, NY
Retrofitting older, less energy efficient water and heating lines with state of the art materials to address water conservation and to create a renewable energy source in the form of a solar hot water heating system